For several years now, a confluence of industry restructuring and advancing technology in the electric power arena has created an environment for innovation in utility control systems. On the one hand, restructuring has moved many utilities from a regulated environment where return on investments was guaranteed through a cost-of-service model to a more market-oriented paradigm where investments must be justified to shareholders. At the same time, IT systems that support transmission and distribution operations have become increasingly more robust. They have also begun to converge, bringing previously separate applications onto a single platform. This changing environment is ripe for innovation. The result is the integration of distribution and outage management capabilities (DMS and OMS) with the traditionally separate supervisory control and data acquisition (SCADA), and energy management systems (EMS). Most SCADA/EMS systems at that time were designed exclusively for a single customer. They were proprietary systems, closed off from one another in keeping with the structure of the industry. Regulated utilities presided over specific control areas with only small amounts of power being traded between them. Interconnection was mostly a means to achieve greater reliability by pooling reserves. But power systems were still vulnerable, and there was a need to develop applications and tools for preventing faults from developing into large-scale outages like the New York blackout of 1977. In the 1980s, as computing technology advanced, it became possible to model large-scale distribution networks in a standardized way. Similarly, SCADA/EMS systems became more sophisticated, providing transmission operators with better tools to control bulk power flows. In the business world, this was also the era of deregulation. The airline, telecommunications and natural gas industries were all liberalized, and regulators and utilities alike naturally began to consider doing the same for electric power. For this, an entirely new set of IT systems would be needed (mostly to administer the wholesale markets), in addition to enhancements to existing SCADA/EMS technology. Perhaps not coincidentally, the new generation of control systems that emerged by the early 1990's made the prospect of deregulation feasible. Distribution management systems (DMS) and outage management systems (OMS) have undergone similar changes over the years, largely due to advances in computing technology. DMS originated as distribution-level extensions to SCADA/EMS systems or as stand-alone systems. What distinguishes them from their transmission-level cousins is the addition of applications specific to distribution operations. For example, the ability to model line cuts is very common at the distribution level. Distribution networks are also constantly being reconfigured to accommodate new construction, maintenance and unplanned local outages. They also contain many more power system objects than transmission networks. The unique demands of distribution operations drove the development of DMS to the point where these systems became clearly distinct from SCADA/EMS.
Better information sharing, more coordination between transmission and distribution operations, enhanced customer service and improved safety are also priorities. Automation, and specifically advanced monitoring and control systems, have delivered improvements across all of these areas. Now, the technologies that enabled those improvements are beginning to converge. The objectives of the integration of SCADA/EMS with previously separate distribution and outage management functions were multifaceted. The solution was envisioned as a means to deliver several operational improvements that would in turn have a positive impact outside the control room. These included:
Of course, there is a certain amount of overlap between these items, but that fact merely underscores the significance of integration of utility control systems. The benefits of convergence run to many end results.
In the past, the EMS (transmission) and DMS (distribution) were separated both functionally and, in medium and large sized utilities, physically as well. When, for example, a particular substation breaker needed to be taken out of service, the EMS operator was dependent upon his DMS counterpart to inform him of the outage. This was - and in many locations still is - accomplished using manual processes like phone calls and email. The transmission operator would then tag the corresponding substation breaker on his system and make whatever operational adjustments were needed. Using an integrated system, the transmission and distribution operators both see the same information - tags only need to be applied or removed once. This reduces the amount of paperwork operators need to complete, increases accountability and improves the tracking of safety documents. Of course, the real benefit lies in the utility's ability to provide more timely and accurate information to customers. Another example of integration is the convergence of Distribution Management with Outage Management Systems. Traditionally, these were independent of one another — DMS dealt with operational matters like switch orders and load flows while OMS was specifically concerned with trouble call analysis and crew management. Under an integrated system, the outage management function can draw on data from the DMS to pinpoint unplanned outages using advanced fault location algorithms.
Where to go from here? The next frontier in power systems monitoring and control is a group of technologies that collectively are known as Wide Area Monitoring Systems (WAMS). They are not a replacement for SCADA/EMS/DMS or any of the other applications discussed here, but rather a supplement to them. WAMS utilize sensors called phasor measurement units to take highly accurate (to one microsecond) time-synchronized readings of grid conditions at strategic points across a very large area. These readings are then sent to a central control system which runs continuous online grid security assessments. WAMS address the time-lag issue by using a GPS satellite to time-stamp each reading as it is taken at its point of origin. Then, when phasor measurements come into the control center from far-flung points on the grid, they can be compiled to present grid operators with a very precise picture of what is happening on the system in real time. More importantly, they can see what is happening beyond their own control area - a major advancement over current methods. In fact, WAMS can really be seen as a bridge between large sections of the grid that is analogous to the bridge between transmission and distribution that integrated systems like Network Manager provide. In the coming years, WAMS are likely to become a common fixture in utility control rooms, and eventually a wholly integrated component of power network control systems. Marina Öhrn, Amitava Sen
|